CNG & City Gas Distribution
- Identify Project Objectives / Guidelines
- Screening Studies
- ROM Estimates
- Optimization Studies
- Basis of Design (BOD) / FEED Design Basis
- PFDs / P&IDs / Plot Plans / Eqpt. Data Sheets
- Process Description, Operation & Control Philosophy
- Plant & Equipment Layouts
- Piping Classification / Pipeline Alignment Sheets
- EPC Cost Estimates (Class-2 / Budgetary)
- EPC Execution Strategy
- EPC Schedule & Schedule Risk Analysis
- Studies / Surveys
- Equipment & Bulk Material Requisitions (MRs)
- 3-D Modelling
- Plant & Equipment Layouts
- Equipment Data Sheets & Specifications
- Piping Layouts, Isometrics & Line Lists
- MTOs (Bulk Materials)
- AFC / IFC Drawings & Documents
- Elect., Instr. & Telecom Cable Schedules, Layouts & Routing Details
- Power System Studies
- Value Improvement / Enhancement Studies
- Technical Evaluation of Long Lead Items (LLIs)
- Commissioning & De-Commissioning Dosiers
- Economic Analysis & Sensitivity Analysis
- Screening / Feasibility / Conceptual Phase
- FEED Phase
- EPC Execution Phase